Collingwood

San Francisco, CA

The purpose of this project was to open up the first floor garage space to create additional parking within the building. A new steel framing system was integrated into the existing wood structure allowing for removal of all existing interior wood posts. In addition, certain perimeter concrete retaining walls were replaced due to deterioration and water damage as part of the project.